    The Committee on Health and Human Resources moved to amend the bill on page one, section one, line twenty five, after the word “authorized” by striking out the period and adding the following: with the amendments set forth below:

    On page seven, after subdivision 3.3.d., by inserting a new subsection, designated subsection 3.4., to read as follows:

    3.4. Specifications – The applicant or the applicant’s engineer shall supply complete, detailed technical specifications for the proposed project, including: pipe, valves and other building materials; a program for keeping existing public water system facilities in operation during construction of additional facilities so as to minimize interruption of service; laboratory facilities and equipment; the number and design of chemical feeding equipment; and materials or proprietary equipment for sanitary or other facilities including any necessary backflow or backsiphonage protection.;

    On page eleven, by striking out §65-77-5. and inserting in lieu thereof §64-77-5.;

    On page thirty-five, paragraph 6.3.h.2., after the words “at a minimum,” by inserting the word “of”;

    On page forty, paragraph 6.4.g.1., by striking out the word “led” and inserting in lieu thereof the word “lead”;

    On page forty-five, subdivision 6.4.i.2., by striking out the word “devise” and inserting in lieu thereof the word “device”;

    On page sixty-seven, subdivision 7.5.d.2., by striking out the word “shallbe” and inserting in lieu thereof the words “shall be”;

    And,

    On page sixty-seven, subdivision 7.5.e.3., by striking out the word “serve” and inserting in lieu thereof the words “severe”.

 

 